The Festiniog Railway from 1950: From 1950

by Andrew Wilson

0 ratings • 0 reviews • 0 shelved
Book cover for The Festiniog Railway from 1950

Bookhype may earn a small commission from qualifying purchases. Full disclosure.

The Festiniog Railway can trace its history back to 1829 and it was constructed to serve the slate quarries in the area. It was built to the gauge of 2ft as this was the track width used in the quarries. Originally powered by gravity and horses, by 1863 steam had come to the line. In 1869 the first Fairlie-designed double locomotive appeared. The railway was built to serve the slate trade but by the First World War trade had declined due to a number of factors. Passenger traffic was by then the mainstay of trade and the summer tourists kept the line in profit. But the Second World War was to see the closure of the line. It lay after the war, neglected and vandalised, until 1950 when steps were made towards preservation. By 1954 that had become a reality and the wonderland of Wales was back up and running. Today it is one of the best known of Wales' narrow gauge railways.

  • ISBN10 0752423975
  • ISBN13 9780752423975
  • Publish Date 1 August 2002
  • Publish Status Active
  • Out of Print 28 May 2024
  • Publish Country GB
  • Imprint The History Press Ltd