Sheridan House
1 total work
A guide for those who have neither an unlimited array of power and hand tools nor the skills to use these tools well. The boat owner is led step-by-step through more than 20 substantial projects, including leading control lines aft, relocating a VHF radio, coverting an icebox to refrigeration, sound insulating an engine, repairing a bilge pump and installing shelves, lockers, stereos and televisions.