5,449 books • 2 series
CT33 3-17 Moving In-Service Pipeline Trainee Guide
CT5 3-17 Inspect the Condition of External Coating on Buried or Submerged Pipe Trainee Guide
CT44 8-17 Inspection, Test and Maintain Temperature Transmitters for Hazardous Liquid Leak Detection Trainee Guide
CT34 0-17 Inspect Existing Pipe Following Movement Trainee Guide
CT2 1-17 Verify Test Lead Continuity Trainee Guide
AOCFG-17 Abnormal Operating Conditions Field & Gas Trainee Guide
CT21 3-17 Internal Inspection of Valve and Components Trainee Guide
CT54 0-17 Test Remote Control Shutdown Devices Trainee Guide
CT8 2-17 Measure Wall Thickness with Ultrasonic Meter Trainee Guide
CT9 2-17 Install Galvanic Anodes Trainee Guide
CT1 1-17 Measuring Structure-to-Soil Potentials Trainee Guide
CT7 6-17 Apply Coating Using Spray Applications Trainee Guide
CT22 1-17 Inspect Tank Pressure/Vacuum Breakers Trainee Guide
CT7 3-17 Prepare Surface for Coating by Abrasive Water Blasting Trainee Guide
CT44 6-17 Maintain Flow Meters for Hazardous Liquid Leak Detection Trainee Guide
CT63 1-17 Start-up of a Liquid Pipeline (Field) Trainee Guide
CT2 3-17 Install Test Leads by Non-Exothermic Welding Methods Trainee Guide
CT28 0-17 Provide Security for Pipeline Facilities Trainee Guide
CT42 7-17 Welding Trainee Guide
CT5 2-17 Examine for External Corrosion on Buried or Submerged Pipe Trainee Guide
CT40 6-17 Install and Remove Plugging Machine Trainee Guide
CT33 1-17 Determine Allowable Line Pressure in Section to be Moved Trainee Guide
CT65 2-17 Shutdown of a pipeline (gas) Trainee guide
CT9 4-17 Install Impressed Current Groundbeds Trainee Guide